Malaysian expertise. Since 2002.cbertecs@cbertecsystems.com

Services

Dredging Works

Cutter Suction Dredging (CSD)

Cutter Suction Dredging (CSD)

Specialized dredging solutions using Cutter Suction Dredgers (CSD) to efficiently excavate and remove accumulated sediment from reservoirs and designated waterways, supporting waterway maintenance and sustainable water management.

Sediment Handling, Transportation & Disposal

Sediment Handling, Transportation & Disposal

Comprehensive sediment management services, including loading, transportation, temporary storage and disposal at designated locations in accordance with project specifications and environmental requirements.

Sand Mining

Sand Mining

Professional sand extraction operations utilizing specialized dredging vessels and hydraulic pumping systems to support efficient material recovery and handling.

River Desiltation

River Desiltation

River desiltation services to remove accumulated sediment, restore river channel capacity, improve water flow and support effective waterway maintenance.

Civil and Construction Works

Dyke construction with excavator and truck

Dyke Construction

Dyke construction for river mouth conservation and related marine infrastructure works.

Excavator placing rock for dyke construction

Dyke Construction Works

Rock placement during dyke construction.

Sheet pile decantation area pond

Sheet Pile Decantation Area Pond

Construction of sheet pile decantation areas for sediment storage and drying before transportation to permanent disposal areas.

Dredging Equipment Fleet

Adolwiss 11

Adolwiss 11

Model: JLCSD300
Type: Cutter Suction Dredger

Adolwiss 13

Adolwiss 13

Model: JLFPS300
Type: Floating Pump Station

Adolwiss 21

Adolwiss 21

Model: JLCSD300
Type: Cutter Suction Dredger

Vessels

ItemModelType
DredgerJLCSD 499 Adolwiss 17CSD
DredgerJLCSD 300 Adolwiss 11CSD
DredgerJLCSD 300 Adolwiss 21CSD
Pump StationJLFPS 300 Adolwiss 13Booster
BoatWBLMT - Adolwiss 22Tugboat
BoatWBETIKA - Adolwiss 23Tugboat
Machineries
ItemModelType
ExcavatorHITACHI / EX210LCK -5Long arm
ExcavatorHITACHI / EX200LC-1Long arm
ExcavatorSANY / SY335CShort arm
ExcavatorCATERPILLAR / 330BLLong arm
ExcavatorKOBELCO / SK200XDL-10Long arm
ExcavatorHITACHI / ZX3300LC-5GTelescopic
ExcavatorHITACHI / ZX200Short arm
ExcavatorHITACHI / ZX330LC -3Long arm
ExcavatorSANY / SY215CLong arm
ExcavatorSUMITOMO SH 200LC-3Long arm
ExcavatorSANY / SY356HShort arm
Lorry
ItemModelTypeQuantity
LorryISUZU / FVZ34SU-PDRORO2

Projects

Project Period: 2 Years (2024 till 2025)

Ringlet Reservoir, Cameron Highlands

Removal, Storage and Disposal of Sediment at Ringlet Reservoir, Cameron Highlands

Main Contractor: CKJ Engineering & Services Sdn. Bhd.

Dredging Volume

350,000 m³

Main Scope

  • Dredging Work — 350,000 m³
  • Construction of decantation areas
  • Removal of dry sediment to permanent disposal areas
  • Desilting works at Sg. Ringlet
Project Period: 6 Months (March 2026 till September 2026)

Sg. Golok, Tumpat

Kerja-Kerja Pemuliharaan Muara Sg. Golok (KESBAN – Fasa 1)

Main Contractor: CKJ Engineering & Services Sdn. Bhd.

Dredging Volume

125,000 m³

Main Scope

  • Dredging Work — 125,000 m³
  • Dyke Construction
  • Beacon Light

Up next · Our Team

Meet the people behind the work.

Get to know the team guiding our projects and supporting our clients.

Meet our team